Clissold House

The basement of Clissold House had a cavity drain membrane system applied throughout the vault, one which also incorporated a double chamber feature. Within the selected area full waterproof conditions were achieved and a sump chamber upgrade was also included as a hidden well was unearthed. The work on this project started in 2010 and has now been completed. The restored

Sussex Healthcare

Surrey Basements were instructed to excavate the existing basement floor level to increase the head height and to allow for a waterproofing system and also for plinths to house boilers and various plant. To achieve the required head heights large sections of the foundations were required to be underpinned with a new reinforced concrete slab tied in. The chosen waterproofing